STATEMENT

.    
.

Parts changed as standard:
100% of all bearings on a total rebuild, cylinder grippers low profile, delivery chains, transfer grippers, infeed grippers, wire rope for delivery table, track cam for delivery is changed when it is worn or damaged, and all air pipes.

.

..

It is our mission at B & H Print Engineers to supply the customer with machines that are owned by us and located at our works. This will ensure that you will receive the machine on the due date agreed.

The machine will be totally rebuilt by out trained staff ensuring quality and future back-up service, should this be required.

We do not use second-hand dealers to supply us with machinery, unlike most of our competitors.

Our engineering section boasts two CNC mills, three lathes, one radial drill, two pillar drills and a surface grinder plus other ancillary machines and equipment. We manufacture over 40 components to the same existing standards as the original part.

The rebuilding process will take approximately 320 hours, but this does not include cleaning and painting.

.

.
 

Dismantle:
We have used the word dismantle throughout the schedule. It is impossible to include every detail of the dismantling and re-building process. To appreciate in full the attention to detail and the existing standards at which we work the machinery must be viewed at our works.

We welcome all future customers to view the equipment and run extensive trials. We will, at your request, visit existing customers with our machinery so that you can see the machine in full production.